COMPANY
History
CEO Message
Management Philosophy
Research and Development
Certificate
Location
PRODUCT
One Tank(GRP)
(3D)LASER Processing
Plant Technology
FACILITY
Facility Retention Status
Factory Introduction
CUSTOMER
Notice
Distributor List
Inquiry
Catalogue
KOR
ENG
KOR
ENG
COMPANY
History
CEO Message
Management Philosophy
Research and Development
Certificate
Location
PRODUCT
One Tank(GRP)
(3D)LASER Processing
Plant Technology
FACILITY
Facility Retention Status
Factory Introduction
CUSTOMER
Notice
Distributor List
Inquiry
Catalogue
PRODUCT
Global company in GRP industry with cutting-edge facilities and leading technology
HOME
PRODUCT
ONE TANK (GRP)
One Tank(GRP)
(3D)LASER Processing
Plant Technology
GRP Water Tank
Water Tank Panel
Watertightness, Drain Capability and Strength of Water Tank
Reinforcement Structure
Partition Type Water Tank
Excellent Heat Insulation
GRP Two-peace Water Tank
Water Tank Facility
1. GRP Two-peace Water Tank Property
Excellent Insulation
- Insulated panel with 4 layers structured & using Eco-friendly
Polyurethane heat insulating material ensure excellent insulati effect
Easy to clean & Excellent hygienic
- Because of wide manhole, it is easy to clean inside of water tank & it has excellent hygienic & watertightness
Excellent durability
- It secures excellent surface strength & durability as Using high-temperature & high pressure press machine (2,500 Ton)
Competitive Price
- Excellent price competitiveness & High quality Water tank with no tie-rod type
Easy & quick to install
- It is easy and quick to install with easy assembly of upper & lower panels
Structure of Non Skid base
- Excellent Earthquake-resistant without concrete frame & skid base.
2. GRP Two-peace Water Tank Item Name Code and Form
GRP Two-peace Water Tank 1㎥ TYPE (5㎡)
GRP Two-peace Water Tank 2㎥ TYPE (8㎡)
GRP Two-peace Water Tank 3㎥ TYPE (10㎡)
GRP Two-peace Water Tank 5㎥ TYPE (14㎡)
GRP Two-peace Water Tank 6㎥ TYPE (17㎡)
3. Type & Shape of GRP Two-peace Insulated panel
4. Assembly of Insulated panel
ⓐ Applying glue on Insulated cover with urethane foaming
ⓑ Applying glue on GRP Two-peace Water Tank Panel which installation is complete.
ⓒ Glue to dry : About 7 minutes at room temperature, around 30℃, About 12 minutes at room temperature, around 15℃.
ⓓ Putting the dried Insulated cover on GRP Two-peace Water Tank Panel which applied glue.
ⓔ Applying silicone on the edge of Insulated cover.
ⓕ Assembly of inlet, outlet, Socket etc.